We had a glitch in the bilge pump matrix and as a result, our batteries took a hit. Had to instal all new batteries compliments of the warranty. Since there wasn't such a rush this time I went ahead and replaced all the wiring, terminals, and put in a new smart charger. 

New acrylic on the hatches. This job took much longer than expected removing the old glue. Hopefully it will stop the one or two leaks we have. 


Everything is cleaned and prepped. New glass gets caulked today. 


These are the old diaphram pumps. Obviously not in the best condition. Replacing them with modern technology and all new hoses. 

Today's project, caulking in the new hatches with Sika-flex. Luckily the temperature today should be in the high 60's. 